本页面暂时只有英文版。

Heven AeroTech opens Virginia hydrogen drone plant, first of a planned US network

The 56,000 sq ft Winchester site was set up in 90 days and will build the Z1 hydrogen-powered drone.

9DOF Desk编辑:Wonje Jeon阅读约 1 分钟来源:1

关键数据

Factory size
56,000 sq ft
Setup time
90 days

它能做什么

Endurance
10+ hours
Payload
Up to 10 lb
Max takeoff weight
55 lb
Cruise speed
64 mph

Heven AeroTech has a new 56,000 sq ft plant in Winchester, Virginia, its first on the East Coast. The site begins a planned US network of factories for hydrogen-powered drones and adds to its existing production base in the Columbia River Gorge.

Heven said it stood the site up in 90 days. It will make the Z1, a vertical takeoff aircraft with more than 10 hours of endurance and a payload of up to 10 pounds. The Z1 weighs up to 55 pounds at takeoff, cruises at 64 mph and is on the Defense Innovation Unit's Blue UAS Select list. Hiring has begun for assembly, quality, operations and supply chain roles.

Virginia is the model for later sites. Each will build hydrogen propulsion, and plans include research labs, automated production and, possibly, room for other technology firms. Chief executive Bentzion Levinson said the network moves hydrogen drones from boutique production to an industrial capability. Heven says the build-out should add hundreds of jobs in the next few years.

来源

  1. Heven AeroTech Stands Up Hydrogen Drone Factory in 90 DaysDroneLife · 2026年9月2日

发布前经 9DOF 编辑对照上方来源核查。数字以来源报道为准。发现错误? 告诉我们 我们会在本页更正。

本文涉及的公司

  • Heven Aerotech

相关报道

每周简报

9DOF 每周简报

机器人与无人机,每周一送达。

新闻 · 交易 · 活动 · 也在 Telegram

每周一封邮件。第一期发出前,我们会请你确认。可随时退订。

Cookie 设置

必要登录、安全、语言、主题以及这项选择。
始终开启
隐私政策

登录

免费查看所有交易、投资方和市场图表。

或使用邮箱
忘记密码?

第一次来 9DOF?创建免费账户