이 페이지는 현재 영어로만 제공됩니다.

Heven AeroTech opens Virginia hydrogen drone plant, first of a planned US network

The 56,000 sq ft Winchester site was set up in 90 days and will build the Z1 hydrogen-powered drone.

9DOF Desk편집 Wonje Jeon1분 분량출처 1건

주요 수치

Factory size
56,000 sq ft
Setup time
90 days

이런 걸 할 수 있습니다

Endurance
10+ hours
Payload
Up to 10 lb
Max takeoff weight
55 lb
Cruise speed
64 mph

Heven AeroTech has a new 56,000 sq ft plant in Winchester, Virginia, its first on the East Coast. The site begins a planned US network of factories for hydrogen-powered drones and adds to its existing production base in the Columbia River Gorge.

Heven said it stood the site up in 90 days. It will make the Z1, a vertical takeoff aircraft with more than 10 hours of endurance and a payload of up to 10 pounds. The Z1 weighs up to 55 pounds at takeoff, cruises at 64 mph and is on the Defense Innovation Unit's Blue UAS Select list. Hiring has begun for assembly, quality, operations and supply chain roles.

Virginia is the model for later sites. Each will build hydrogen propulsion, and plans include research labs, automated production and, possibly, room for other technology firms. Chief executive Bentzion Levinson said the network moves hydrogen drones from boutique production to an industrial capability. Heven says the build-out should add hundreds of jobs in the next few years.

출처

  1. Heven AeroTech Stands Up Hydrogen Drone Factory in 90 DaysDroneLife · 2026년 9월 2일

게시 전에 9DOF 편집자가 위 출처와 대조해 확인했습니다. 수치는 출처가 보도한 그대로입니다. 오류를 발견하셨나요? 알려 주세요 이 페이지에서 바로잡겠습니다.

이 기사의 기업

  • Heven Aerotech

관련 기사

주간 뉴스레터

9DOF 브리핑

로보틱스와 드론, 매주 월요일.

뉴스 · 거래 · 이벤트 · 함께 보기: Telegram

일주일에 이메일 한 통. 첫 호를 보내기 전에 확인을 요청합니다. 언제든 구독을 취소할 수 있습니다.

쿠키 설정

필수로그인, 보안, 언어, 테마, 그리고 이 선택.
항상 켜짐

로그인

모든 딜, 투자사, 시장 차트를 무료로 보세요.

또는 이메일로
비밀번호를 잊으셨나요?

9DOF가 처음이신가요? 무료 계정 만들기