FactoryHumanoidsUnited States

Tesla takes 46 days to strip Fremont's Model S/X line for Optimus robots

Elon Musk has said the plant will eventually build one million robots a year, with no firm timeline.

9DOF DeskEdited by Wonje Jeon1 min readSources: 1

Key numbers

Line teardown time
46 days
Long-term output target
1 million a year
Last Model S/X built
May

Tesla has emptied the former Model S and Model X line at its Fremont, California, plant so Optimus humanoid robots can be built there, InsideEVs reported. Tesla Manufacturing posted a video of the teardown on 10 July and said it took 46 days. The last Model S and Model X cars came off the line in May.

The cleared floor is meant to hold equipment for assembling the robots, but the installation is still only planned. The conversion covers that assembly area, not the whole site. InsideEVs also reported that Tesla already runs an Optimus pilot production line at Fremont and has stepped up hiring for the programme this year.

Musk said earlier this year that the factory would eventually make one million robots a year, with no date attached. For now the change is an allocation of existing floor space, and no increase in robot output has been reported.

Sources

  1. Tesla clears Fremont assembly line for Optimus robot factoryHumanoid.guide · 22 Nov 2026

Checked by a 9DOF editor against the sources above before publishing. Figures are as reported by the sources. Spot an error? Tell us and we'll correct it on this page.

Companies in this story

  • Tesla

Related stories

The weekly

The 9DOF Briefing

Robotics and drones, every Monday.

News · Deals · Events · Also on Telegram

One email a week. We'll ask you to confirm before the first issue. Unsubscribe any time.

Cookie settings

EssentialSign-in, security, language, theme and this choice.
Always on
Privacy policy

Sign in

See every deal, investor and market chart, free.

or with email
Forgot password?

New to 9DOF? Create a free account