このページは現在、英語のみです。

Amazon picks Greenwood, Indiana for a US$100m-plus plant making warehouse robot equipment

The 585,000 sq ft Greenwood factory is due to open by 2028 with about 300 staff.

9DOF Desk編集:Wonje Jeon約1分で読めます出典:1件

主な数字

Investment
>US$100M
Floor area
585,000 sq ft
Planned jobs
About 300
Expected opening
By 2028

Amazon will put more than US$100 million into a Greenwood, Indiana factory that makes equipment for its warehouse robots, according to plans it published. The Wall Street Journal reported that Greenwood will be its fourth robot-making site. Two older plants are in Massachusetts, and Austin, Texas was added in August.

The 585,000-square-foot building will cut, weld and powder-coat parts and then assemble them on site, with robots handling the welding. Around 300 people will work there, on average pay near US$100,000 a year for the factory and engineering roles. Opening is expected by 2028.

Greenwood is a far smaller outlay than Austin, which Amazon says will cost billions of dollars. Amazon says its US lines have built more than 1 million robots, used at more than 300 facilities and involved in 75% of customer orders. The Westborough plant, opened in 2021, can produce up to 1,000 robots a day.

出典

  1. Amazon to spend $100M on Indiana plant, its fourth site for building robotsSiliconANGLE · 2026年9月24日

公開前に9DOFの編集者が上記の出典と照らし合わせて確認しました。数値は出典の報道どおりです。誤りを見つけたら お知らせください 。このページで訂正します。

この記事の企業

  • Amazon Robotics

関連記事

ウィークリー

9DOF ブリーフィング

ロボティクスとドローンを、毎週月曜日に。

ニュース · 取引 · イベント · こちらでも: Telegram

メールは週に1通です。初回の配信前に確認をお願いします。いつでも配信を停止できます。

Cookie設定

必須ログイン、セキュリティ、言語、テーマ、そしてこの選択。
常にオン

ログイン

すべての案件・投資家・市場チャートを無料で。

またはメールアドレスで
パスワードをお忘れですか?

9DOFは初めてですか?無料アカウントを作成